Hospitable Framwork
Beginning of paper
Ohio's Flexicore Building Systems make short work of hotel construction
When an amusement park operator decided to construct a new hotel to meet increased business, it faced challenges ranging from winter month delivery to a site with limited access. The solution came from Dayton, Ohio-based Flexi ....
Middle of paper
.... and throughout the world. Each year, Cedar Point hosts 3 million+ guests.
As attendance increases so does the demand for additional hotel rooms. The amusement park is owned and operated by Cedar Fair L.P, the company currently has three hotels on or very near the park property, but there is still a need for more.
In 1997, architects began designing the Breakers Tower, a 10-level structure nesfled between the original Hotel Breakers, constructed in 1905, and Bon Air, a wing of the hotel ....
------------------
Word count: 912
Page count: 4 (approximately 250 words per page)